Türkiye Voleybol Federasyonu
| Province | Project Name | kWe | kWp |
|---|---|---|---|
| Gümüşhane | Filenin Sultanları GES | 3.472,96 | 4.004,00 |
End-to-End Business Development
Filenin Sultanları GES (Turkish Volleyball Federation)
We completed the end-to-end business development and permitting process of the “Filenin Sultanları GES” project, named after our legendary national team and developed to meet the electricity needs of the sports halls of the Turkish Volleyball Federation, which has made us proud with its European and World championships.
Strategic Site Analysis and Constraint Assessment: In the light of our digital data bank, we completed geological, technical, ownership and grid constraint analyses in full and identified the most feasible project site.
Grid Integration and Optimum Connection: By modelling the grid infrastructure from multiple angles, we determined the right connection point for safe transfer of energy; we developed engineering solutions that reduce investment and operating costs.
Scenario Development, 3D Modelling and Simulation: We created multiple scenarios suited to the Federation’s corporate consumption profile; we prepared site-specific layout alternatives, advanced 3D shading analyses and generation simulations.
Feasibility and Obtaining the Call Letter (BAÇM): In line with comprehensive technical and financial feasibility studies, we completed the Call Letter for the Connection Agreement (BAÇM) process and secured capacity allocation.
Institutional Opinions and Sustainable Public Relations: We obtained official opinions from nearly forty authorised public institutions in the ÇED and zoning processes; by building a sustainable bridge of communication with the local community and local administrations, we fully established social consensus on site.
Environmental Permits and Finalisation of Zoning: In line with continuously monitored institutional opinions, we concluded the ÇED decisions and non-agricultural use permits; we finalised the master and implementation zoning plans following the statutory public display periods.
Transmission Line (ENH/EİH) and Engineering Approvals: We designed line routes that minimise energy transmission losses; we obtained approval for detailed electrical, structural and infrastructure engineering projects to TEDAŞ and TEİAŞ standards.
Handover of the Permitted Site and Completion: With the connection agreement executed and the final construction permit obtained, we handed over the project site ready for turnkey installation; we share the pride of contributing to the green energy transformation of Turkish sport.