Energy Transmission Line Construction
With our innovative and meticulous approach to service, we manage the entire process end to end for Medium Voltage (OG) and High Voltage (YG) energy transmission and distribution lines: from optimum route identification, statutory permits, expropriation and ownership solutions to TEDAŞ- and TEİAŞ-approved design and line construction.
Route Survey and Optimum Line Assessment
With state-of-the-art surveying and mapping equipment, we carry out high-precision topographic surveys, LiDAR/UAV-assisted terrain scanning and route assessment work along the corridors where energy transmission and distribution lines (ENH/EİH) will pass. By analysing natural obstacles, property boundaries, zoning plans and environmental constraints, we determine the optimum line route, one that both lowers construction cost (CAPEX) and minimises future expropriation and right-of-way risks.
Preparation of Engineering Designs and TEDAŞ / TEİAŞ Approval Processes
In line with the chosen route, we prepare profile drawings, tower spotting plans, sag-tension calculations, short-circuit analyses and protection and earthing designs in full compliance with national grid regulations and international standards. Once crossing permits have been obtained from all relevant public institutions, we submit the implementation projects to the technical review and approval bodies of TEDAŞ and TEİAŞ, and by proactively managing the revision and review stages we bring the official design approvals to a full conclusion.
High-Standard Material and Equipment Procurement
So that the line can serve without interruption even in harsh climatic and geographical conditions, we undertake the procurement of galvanised lattice and polygonal towers, high-conductivity conductors and earth wires (OPGW), silicone/glass insulators, hardware sets and underground high-voltage cables. All materials, sourced from domestic and global manufacturers fully compliant with TEDAŞ and TEİAŞ specifications, pass pre-shipment factory acceptance tests (FAT) and quality control inspections and are delivered to the site in line with the site programme.
Site Setting-Out and Detailed Ground Surveys
With site mobilisation, we set out the tower coordinates from the approved designs on the ground using precise GPS/Total Station instruments. For each tower location we carry out borehole geological-geotechnical ground surveys, rock/soil classification and electrical resistivity measurements, verifying the foundation types and earthing designs one-to-one against actual site conditions. Thanks to this detailed preliminary work, we completely eliminate the unforeseen ground risks and time losses that could arise during foundation excavation and erection.
Meticulous Site Construction and Erection Focused on Grid Supply Security
With an engineering approach that treats grid supply security and the uninterrupted transmission of energy as its foremost priority, we carry out foundation excavations, reinforced-concrete works and deep earthing grid installations in full compliance with Environment, Occupational Health and Safety (ÇİSG / İSG) legislation and with uncompromising site discipline. While our experienced site teams perform tower erection, precise tension stringing of conductors and OPGW, sag adjustment and jointing and insulation works, we ensure transparent site coordination that respects the investor’s goals and the sensitivities of all stakeholders along the route (local communities, landowners and local authorities). At connection points that require a power outage, we work in full coordination with the grid operators to build the line safely, without dispute and on time.
Comprehensive Line Tests, Official Acceptance and Energisation
To integrate the completed energy transmission and distribution line safely into the national grid, we carry out all electrical and mechanical site tests. We complete conductor continuity and insulation resistance measurements, earthing transfer resistance checks, phase sequence verification and OPGW fibre-optic attenuation (OTDR) tests in full. By successfully concluding the site inspections of the TEDAŞ and TEİAŞ acceptance committees and the official provisional acceptance processes, we energise the line safely and enable the facility to begin uninterrupted energy transmission.