Migros Ticaret A.Ş

Province Project Name kWe kWp
Bitlis Migros Bitlis Ahlat GES 20.000 22.928

End-to-End Business Development

Strategic Site Analysis and Constraint Assessment: Within the scope of the project we carried out on behalf of Migros, we completed geological, ownership and grid constraint analyses with our digital data infrastructure and identified the most efficient site.

Grid Integration and Optimum Design: We identified the right connection point that guarantees uninterrupted transmission of energy; we developed optimised engineering models that reduce investment and operating costs.

Scenario Development and Simulation: We developed multiple scenarios for Migros’s corporate electricity consumption and capacity targets; we prepared site-specific layout models, 3D shading analyses and generation simulations.

Official Application and Obtaining the BAÇM: By completing the applications in line with comprehensive technical and financial feasibility reports, we concluded the Call Letter for the Connection Agreement (BAÇM) process and secured capacity allocation.

Institutional Opinions and Social Consensus: While collecting official opinions from nearly forty authorised public institutions during the ÇED and zoning stages, we fully achieved social consensus on site by establishing a transparent, trust-based and sustainable public relations mechanism with the local community, village heads and local administrations.

Finalisation of Environmental and Zoning Plans: In line with institutional opinions whose validity was monitored up to the permit stage, we concluded the ÇED decisions and non-agricultural use permits; we finalised the master and implementation zoning plans following the statutory public display periods.

Transmission Line (ENH/EİH) and Detailed Project Approvals: We carried out energy transmission line route surveys that minimise transmission losses; we obtained approval for electrical, structural and infrastructure implementation projects to TEDAŞ and TEİAŞ standards.

Handover of the Permitted Site: With the Connection Agreement executed and the final construction permit obtained, we handed over the project site to Migros complete and ready for the turnkey EPC (installation) phase.