Cüneyd Zapsu Danışmanlık
Projects Carried Out Jointly with "Proje Enerji"
Strategic Site Analysis and Constraint Assessment: Within the scope of the project we carried out on behalf of Mr Cüneyd Zapsu, together with our project partner, we completed geological, technical, ownership and grid constraint analyses in the light of our digital data bank and identified the most efficient site.
Grid Modelling and the Right Connection Point: We identified the right connection point to ensure safe and uninterrupted transmission of energy; we developed optimised engineering solutions that reduce investment (CAPEX) and operating (OPEX) costs.
Scenario Development, 3D Modelling and Simulation: We developed multiple scenarios suited to our investor’s corporate electricity consumption profile and investment targets; we prepared site-specific layout alternatives, 3D shading analyses and generation simulations.
Official Application and Obtaining the BAÇM: By completing the official processes in line with comprehensive technical and financial feasibility reports, we obtained the Call Letter for the Connection Agreement (BAÇM) and secured capacity allocation.
Institutional Opinions and Sustainable Public Relations: While collecting official opinions from nearly forty authorised public institutions during the ÇED and zoning stages, we fully achieved social consensus on site through the transparent and sustainable public relations mechanism we established with the local community, village heads and local administrations.
Environmental Permits and Finalisation of Zoning: In line with institutional opinions whose validity was monitored up to the permit stage, we concluded the ÇED decisions and non-agricultural use permits; we finalised the master and implementation zoning plans following the statutory public display periods.
Transmission Line (ENH/EİH) and Engineering Approvals: We carried out the most optimum route surveys minimising energy transmission losses; we obtained approval for electrical, structural and infrastructure implementation projects to TEDAŞ and TEİAŞ standards.
Execution of the Agreement and Handover of the Permitted Site: By executing the connection agreement and obtaining the final construction permit, we successfully completed the business development and permitting phase of the project site; we handed over the site ready for installation.
Completion with Our Project Partner and EPC-Ready Handover: We take pride in handing over to our investor, complete and ready for the turnkey EPC (installation) phase, the project whose business development, permitting and engineering groundwork we meticulously completed together with our project partner.
| Province | Project Name | kWe | kWp |
|---|---|---|---|
| Manisa Kula | SPK 1 | 990 | 1,170.24 |
| Manisa Kula | Zeynep 1 | 990 | 1,170.24 |
| Manisa Kula | İskender 1 | 990 | 1,170.24 |
| Manisa Kula | Gelgit 1 | 990 | 1,170.24 |
| Manisa Kula | SPK 2 | 990 | 1,170.24 |
| Manisa Kula | Zeynep 2 | 990 | 1,170.24 |
| Manisa Kula | NGG 1 | 990 | 1,170.24 |
| Manisa Kula | SPK 3 | 990 | 1,170.24 |
| Manisa Kula | İskender 2 | 990 | 1,170.24 |
| Manisa Kula | Gelgit 2 | 990 | 1,170.24 |
| Manisa Kula | NGG 2 | 990 | 1,170.24 |
| Manisa Kula | Zeynep 3 | 990 | 1,170.24 |
| Manisa Kula | SPK 4 | 990 | 1,170.24 |
| Manisa Kula | Neren 1 | 990 | 1,170.24 |
| Manisa Kula | NGG 3 | 990 | 1,060.53 |
| Manisa Kula | İskender 5(3) | 990 | 1,072.72 |
| Province | Project Name | kWe | kWp |
|---|---|---|---|
| Manisa Akhisar | P1 | 990 | 749.69 |
| Manisa Akhisar | DURA | 990 | 1036.15 |
| Manisa Akhisar | PROJE 1 | 990 | 1072.72 |
| Manisa Akhisar | DURASIL C1 | 990 | 1097.10 |
| Manisa Akhisar | DURASIL B1 | 990 | 1097.10 |
| Manisa Akhisar | DURASIL A1 | 990 | 1097.10 |
| Manisa Akhisar | DURASIL A3 | 990 | 1097.10 |
| Manisa Akhisar | DURASIL C2 | 990 | 1097.10 |
| Manisa Akhisar | DURASIL D1 | 990 | 1097.10 |
| Manisa Akhisar | DURASIL C3 | 990 | 1097.10 |
| Manisa Akhisar | DURASIL B2 | 990 | 1097.10 |
| Manisa Akhisar | DURASIL A2 | 990 | 1097.10 |
| Manisa Akhisar | DURASIL B3 | 990 | 1097.10 |
| Manisa Akhisar | İSKENDER 2 | 990 | 1133.67 |
| Manisa Akhisar | İSKENDER 3 | 990 | 1133.67 |
| Manisa Akhisar | İSKENDER 1 | 990 | 1219.00 |
| Manisa Akhisar | DURASIL 1 | 990 | 1219.00 |
| Manisa Akhisar | Zeynep 3 | 990 | 1219.00 |